Friday, 19 April 2013

Satpara Power House No 3 installed capacity 2360 kilowatt (KW) started power generation

Satpara Power House No 3 begins generation
Power House No 3 of Satpara Dam Project with installed capacity of 2360 kilowatt (KW) has started power generation on Friday. The under-construction Power House No 4 with an installed capacity of 1400 KW is also scheduled to go into operation by the end...Satpara Power House No 3 installed capacity 2360 kilowatt (KW) started power generation

No comments:

Post a Comment